Ask anyone who has run an LCA where the time goes, and you’ll hear the same answer. Not the modelling. The data. A study is only as good as the figures that go into it, and most delays happen because nobody knew what to collect, or who had it.
Here’s what we ask manufacturers for when we start a life cycle assessment, where that data usually sits in your company, and how to get it into shape before the study begins. Data collection is the second of the four steps of an LCA, the life cycle inventory, and it’s almost always the longest.
Want it as a spreadsheet? Download the LCA data checklist, the Excel version we give our own clients, with a tab for each section below.
Before you collect anything: agree the scope
What you need depends on the product and the system boundary. A gate-to-gate study only needs data from your own plant. A cradle-to-gate study also needs information on what you buy and where it comes from (our guide to cradle-to-gate assessment explains the difference). Settle the product, the functional unit and the boundary first. It stops you collecting data you don’t need and missing data you do.
Agree the period too. Twelve months is the usual target, ideally a recent financial year, so seasonal changes in production and energy use even out.
1. Complete manufacturing process details
Every step from raw material receipt to finished product. We’ll ask for:
- A process flow diagram showing each step in order
- The inputs and outputs at each step, including intermediate products
- Which steps are shared with other products made on the same site
- Any recycling or rework loops inside the plant
- Production output for the period, in the same unit as the functional unit
Tip: if you’ve prepared a process flow chart for your consent to operate application to the State Pollution Control Board, or for ISO 9001, start from that.
2. Bill of materials
- Every raw material and component, with the quantity used per unit of product
- Packaging, both for the product and for incoming materials, if it’s in scope
- Supplier locations for the main inputs, so transport can be modelled
- Recycled content, where you know it
- Specifications (grade, composition) for anything that makes up a large share of the product’s mass
Tip: the BOM in your ERP is a starting point, but check it against purchase and consumption records. ERP BOMs often show design quantities, not what’s actually used once scrap is included.
3. Energy data
- Grid electricity in kWh, from monthly bills
- Captive or rooftop solar generation, and how much of it you used on site
- Open access or green power purchases, with supporting documents
- Fuels for boilers, furnaces, DG sets and process heat (diesel, furnace oil, LPG, natural gas, coal, biomass) in physical quantities
- Steam or compressed air bought from outside, if any
- Ideally, energy use split by process or line. If you only have site totals, tell us how production is spread across products.
Tip: give us kWh, litres and tonnes, not rupees. Prices change, and a figure based on spend moves even when the actual consumption doesn’t.
4. Waste management data
- Each waste stream by type, with the quantity for the period
- Hazardous and non-hazardous waste kept separate
- Where each stream goes: recycling, co-processing, landfill, incineration or sale to a recycler
- Process scrap, and whether it’s reused internally
- Wastewater volumes and treatment, where relevant
Tip: your waste registers and the annual hazardous waste return you file with the State Pollution Control Board usually cover most of this.
Useful extras
Not always required, but they make the result more accurate:
- Water withdrawal and consumption
- Inbound transport: mode and distance for the main materials
- Outbound distribution, if the boundary goes beyond your gate
- Refrigerant top-ups and any stack monitoring data
- An existing GHG inventory or BRSR environmental data. If you haven’t built one yet, our guide on how to calculate your company’s carbon footprint is a good place to start.
Where the data usually lives
| Data | Usually held by | Typical source |
|---|---|---|
| Process steps and flows | Production or process engineering | Process flow charts, SOPs, consent applications |
| Bill of materials | Production planning, R&D | ERP, BOM master, purchase records |
| Electricity and fuel | Utilities, maintenance, finance | Electricity bills, fuel purchase records, meter logs |
| Waste | EHS team | Waste registers, hazardous waste returns, recycler invoices |
| Production output | Production planning, finance | Production reports, MIS |
| Supplier locations | Procurement | Purchase orders, vendor master |
How to avoid the usual delays
- Name one coordinator. Someone who can chase each department and check the figures hang together. Without one, requests sit in five inboxes.
- Write the units down. kWh or MWh, kg or tonnes. Mixed units are one of the easiest mistakes to make, and one of the hardest to spot later.
- Mark estimates as estimates. An honest estimate is fine. A guess passed off as a meter reading isn’t.
- Say early what you don’t have. Missing data isn’t a disaster if we know at the start. Some things can be measured, some can be estimated, and the study can show how much each gap affects the result. Finding out in week six is what causes delays.
Questions we get asked
What data is needed for a life cycle assessment? At minimum: manufacturing process details, a bill of materials, energy data and waste management data for the product, ideally covering twelve months. Wider boundaries also need supplier, transport and use-phase information.
How many months of data do I need for an LCA? Twelve months is the usual target, so seasonal changes in production and energy use even out. A recent financial year works well.
What if some data isn’t available? Tell your LCA consultant at the start. Some gaps can be filled with measurements or recognised background data, and the study should document estimates and test how much they affect the result.
Can I use data from my BRSR report or GHG inventory? Often, yes. Site energy and fuel figures from a GHG inventory are a good starting point, but an LCA usually needs them split by product or production line.
Who in the company should coordinate LCA data? One named person, usually from EHS, sustainability or production planning, who can chase each department and check the figures for consistency.
Bilancia Consulting is an Ahmedabad based sustainability and ESG advisory firm. We carry out full ISO 14040/14044 life cycle assessments for Indian manufacturers, modelled in SimaPro. For a single product, the study usually takes three to four weeks once we have your data. If you want to check what you already have before you start, a short call will help.
Call +91-9510144494 or email general@bilanciaconsulting.co.in